By Tatyana Mcknight, from Straight from City Hall |
Beginning Nov. 4, 2021, weather permitting, the City will restart concrete repairs on Rocky River Drive from Lorain Avenue to McKinley Avenue. A portion of the street will be closed and one lane of traffic will be maintained in each direction. A complete closure is not expected to occur. No on-street parking will be permitted for the duration of the project in the affected areas and no parking signs will be posted.
The project includes repairing broken concrete pavement and adjusting sunken or damaged utility castings. The work will take place during the hours of 7 a.m. to 5 p.m. The concrete repair project is expected to complete by the end of December 2021.
Questions? Contact the City of Cleveland’s Construction Inspector, Eric Faehner (216) 857-3028.
Editor’s Note: Road construction invariably presents hazards to the public. All travelers are urged to use caution in construction zones. Public safety and the safety of workers is a top priority.